SCE was dispatched to an industrial facility to conduct remediation, repair and replacement of pipes associated with the facility’s sanitary system. Crews found that many pipes contained chromium contaminated water which had to be properly collected and disposed prior to removal of the pipes. Work included the removal or repair of numerous pipe systems located across seven locations. Many installations required the use of HDPE piping and double-walled pipe fusion welding. Crews also installed a temporary overhead pipe system to cross a street from above while other contractors removed an old system from beneath the road.

2776 View