SCE was dispatched to an industrial facility to conduct remediation, repair and replacement of pipes associated with the facility’s sanitary system. Crews found that many pipes contained chromium contaminated water which had to be properly collected and disposed prior to removal of the pipes. Work included the removal or repair of numerous pipe systems located […]

Read More


SCE was contracted to demolish and remove a concrete slab and to repair impacted asphalt. The slab included thickness up to two feet. The challenge at this site was the designation of the area as a Heavy Equipment Exclusion Zone. Because of this HEEZ designation, SCE had to work around significant logistical problems and coordinate […]

Read More


Congratulations to our crews for the SAFE completion of the recent work at the Baha Mar Resort, New Providence, Bahamas. SCE crews mobilized under a contract to install and initiate the operation of a groundwater treatment system at a former laundry facility located on a portion of the mega resort’s property. This is the second […]

Read More